Marine Designs Ltd designs and constructs heavy duty pontoons, including the DockMaster concrete pontoon which is compliant with BS 6349 Maritime Structures Codes, offering a 50 year low maintenance design life with the advantage of rapid build using pre-cast concrete beams and polystyrene. Pontoon widths of between 4m and 10m are offered with high freeboards for commercial berthing applications.
Marine Designs Ltd offers the full service from concept planning through to annual servicing. In recent years the company has completed over ten Crew Transfer bases for the offshore wind industry and installed ferry and tug berths throughout the UK. These projects have included drive on pontoons with specialised vehicles, pontoon mounted cranes and full services including fuel delivery systems.